A project for the Construction and Start-up of a Biomethanization plant for organic fraction of selective collection of municipal waste.

Suris performed the following works:

  • Electrical engineering
  • Power and control
  • Making of one-line diagrams
  • Signalling controls and alarms
  • Distribution panels and sub-panels and CCMs
  • ATEX
  • Lightning rod
  • CONTROL ARCHITECTURE
  • SAFE SOURCE SYSTEM
  • PLCs with 20% of reserve entrances and exits for each type of card
  • HARDWARE BASED ON SIEMENS SIMATIC S7
  • COMMUNICATIONS NETWORK
  • INSTALLATION OF LIGHTING
  • INTERCONNECTION AND INTEGRATION OF ALL THIRD-PARTY PANELS

BREAKDOWN OF CONTROL SYSTEM

  • Siemens Wincc redundancy system
  • Pre-processing and refining control system
  • BACKUSS composting technologist integration
  • TAM sludge technologist integration
  • Water control system
  • BTA biomethanization technologist integration
  • Biogas dispatch system
  • TECNIUM air technologist integration
  • Electrical system integration (low and medium voltage)

Category: WASTE TREATMENT PLANTS

Client: Valoriza Servicios Medioambientales