This is a biodiesel plant located in Seville. Suris carried out the installations of power and control in the biodiesel production zone, the Eex zone. It has 1200 kVA of power installed.
ELECTRICITY
- General low-voltage distribution panel
- Engine manoeuvring panel
- Speed shifters
- Installations of power and control in the biodiesel production plant
- Laying of trays and power control cables for ATEX zones
- Exterior lighting, tanks and truck-loading and auxiliary zones
- Supply and assembly of electrical tracing for interior tanks and pipes. Exterior tracing to loading area with long-line technology
- Installations in technical buildings
- Lightning protection system
- Laying of medium-voltage line and transformer station