The scope of this project involved the remodelling of seven of the eleven floors of the SOUTH TOWER office building of VIDACAIXA.
The remodelling was carried out whilst the building was still in use. SURIS installed the following:
- LV systems (trays, cables, electrical panels, lighting, mechanisms)
- Fire detection and protection systems
- VRV HVAC systems, ventilation system and the entire plumbing system