The Spanish airport company Aeropuertos Españoles y Navegación Aérea (AENA) implemented 35 new billing desks in the Airport of Barcelona in the Inter-modal and Connection Building between Terminals A and B of the Airport.
Suris carried out the electro-mechanical installations, with the following total climatized surface area:
- Total electrical power installed: 2400 KW + 800 KW emergency supply
- Total cooling power produced: 995 KW
- Total caloric power: 752 KW