HOTEL VUELING

In partnership with the airline Vueling, “Hoteles Catalonia” has acted as promoters on the construction project of a 4 star hotel in the centre of Barcelona. The result of this ground-breaking alliance between a hotel chain and an airline company is a unique hotel with 63 guest rooms and a design inspired by the air […]

INTERNACIONAL HOTEL

This hotel enjoys a privileged position in the heart of the tourist and commercial centre of Barcelona, situated in the middle of the Ramblas in front of the renovated “Gran Teatro del Liceu” theatre. The hotel has 59 guest rooms with en-suite bathrooms, heating and telephones, with parking just 100m away. Suris S.L. carried out […]

THE PALACE HOTEL, BARCELONA

The Palace (Barcelona) undertook an important restauration project in which they invested more than 20 million euros, resulting in a new look for the guest rooms, redecoration of the communal areas and the optimization of the architectonic infrastructure.   SURIS S.L. was involved in the development of the Palace Hotel’s refurbishment project and carried out […]

BAIX LLOBREGAT REVERSE ELECTRODIALYSIS (RED)

The company Empresa Metropolitana de Sanejament (EMSSA) is a public entity for the management of wastewater in Barcelona and its metropolitan area, with a population of 4.5 million inhabitants. SURIS carried out the reform work in the installations of high and low voltage, safety, control and HVAC of the Baix Llobregat RED station.

GRANOLLERS REVERSE ELECTRODIALYSIS (RED) OF AIGÜES TER LLOBREGAT (ATLL)

In these works, SURIS carried out installations of high and low voltage, instrumentation and automation of the Granollers water pumping station for the supply company Aigües Ter Llobregat (ATLL), which supplies drinking water to a population of 4.5 million inhabitants in Catalonia. The installation is controlled remotely from a control centre located in Cardedeu, by […]

DATA PROCESSING CENTRE

COLT TELECOM’s new Data Centre is classified as TIER 4 and has a total surface area of 3,000 m2. As the only contractor working on this project, SURIS carried out the complete structural adaptation and reinforcement of the existing floors of the building, as well as the technical floors of the different rooms.   The […]

BARCELONA FOOTBALL CLUB

The scope of the works that SURIS carried out in Barcelona Football Club’s stadium encompassed the disassembly of the existing lighting system and the installation of new floodlighting for the pitch and diesel generators. SURIS installed 348 flood lights of 2,000W each (total illumination capacity of 696KW). The systems were adapted to incorporate network switches […]

VALENTINE

At Barnices Valentine, they are experts in paints and they are committed to quality and respect for the environment. The facilities are of 25,000 m² and they have become one of the most technologically-advanced factories in Europe. Suris carried out the installations of HVAC, fire detection and extinguishing, smoke control and evacuation, high-voltage and low-voltage […]

LA VANGUARDIA

Cre-a has two latest-generation printing presses, which began to operate in the Zona Franca area of Barcelona and which print the newspapers La Vanguardia and El Mundo Deportivo, among other publications. The industrial project was designed by the Godó group. Suris carried out the installations of electricity and climatization, on a 21,700 m² plot of […]

VILADECANS BUSINESS PARK

Works were carried out to install electromechanical systems in the new office complex “VILADECANS BUSINESS PARK” located between the C32 motorway and Avenida Siglo XXI, in Viladecans (Barcelona). The main characteristics of this project are that the complex is comprised of four buildings (Australia, Brazil, Canada, and Denmark) with a total of 33,864 m2 of […]