CESPA HOSTALETS DE PIEROLA

In the facilities of Metropolitan Centre number 4 for Integrated Municipal Waste Management, a mechanical-biological processing of municipal waste originating from the Barcelona Metropolitan area and the South-East part of the district of la Anoia is being carried out. Specifically, the entry of both remainder fraction and organic fraction of municipal solid waste (OFMSW) in […]

CTR GOGERSA ASTURIAS

A project for the Construction and Start-up of a Biomethanization plant for organic fraction of selective collection of municipal waste. Suris performed the following works: Electrical engineering Power and control Making of one-line diagrams Signalling controls and alarms Distribution panels and sub-panels and CCMs ATEX Lightning rod CONTROL ARCHITECTURE SAFE SOURCE SYSTEM PLCs with 20% […]

TERSA GAVA

TERSA is an urban waste processing and selection company. SURIS has carried out the full redevelopment of the plant in the bulk and packaging zone. The general distribution panels of the plant, lighting, power, and system control panels have been changed, including all associated installations, with the SCADA system and control, automating the new bulk waste […]

The temporary joint venture UTE TEM Tratamientos Ecológicos del Maresme

On 1 January 2007, the temporary joint venture UTE TEM (Tratamientos Ecológicos del Maresme) assumed the concession for the Integral Waste Valuation Centre of El Maresme for a period of 15 years.  The new assignee companies are implementing renewable energies in the new facilities, with the result of this being the creation of some thirty […]

CTR – VALLES

In the district of Vallés Occidental, in Barcelona, Suris, S.L. carried out full installations in the new Waste Processing Centre (CTR Vallés), promoted by the town councils and by the Consortium for Waste Management of Vallés Occidental. These facilities allow our territory to carry out an important change of model in the management of municipal waste, […]

DUET FIT UNIVERSITAT

SURIS installed all of the HVAC, domestic hot water production (DHW), plumbing, gas, fire protection, security, CCTV, PA, electrical and communications facilities and systems in the DUET FIT UNIVERSITAT sports centre. The new centre is dedicated to a new concept of “low-cost” gym, allowing members to take advantage of the economical prices. The centre belongs […]

DUET FIT SAGRADA FAMÍLIA

SURIS installed all of the HVAC, DHW production, plumbing, gas, fire protection, security, CCTV, PA, electrical and communications facilities and systems in the DUET FIT SAGRADA FAMILIA sports centre. The new centre is dedicated to a new concept of “low-cost” gym, allowing members to take advantage of the economical prices. The centre belongs to the […]

DUET FIT VIA AUGUSTA

SURIS installed all of the HVAC, DHW production, plumbing, gas, fire protection, security, CCTV, PA, electrical and communications facilities and systems in the DUET FIT UNIVERSITAT sports centre. The new centre is dedicated to a new concept of “low-cost” gym, allowing members to take advantage of the economical prices. The centre belongs to the DUET […]

MYRURGIA SPORTS COMPLEX

Integrated facilities and systems were installed in the sports centre situated near Sagrada Familia. The centre covers a total surface area of 8,000 m2, of which 2,000 m2 are dedicated to water sports and activities.

MUNICIPAL WATER SPORTS COMPLEX

The Móra d’Ebre Municipal Water Sports Complex has a total constructed area of 2,300 m2 distributed over two floors. The building includes a water area with a swimming pool measuring 25 x 12.5 m, a beginners’ pool, hydro massage, sauna and natural solarium, and a dry area with a gym, a fitness studio for classes, […]