The scope of the works that SURIS carried out in Barcelona Football Club’s stadium encompassed the disassembly of the existing lighting system and the installation of new floodlighting for the pitch and diesel generators.
SURIS installed 348 flood lights of 2,000W each (total illumination capacity of 696KW). The systems were adapted to incorporate network switches in the general panels of the four transformer stations that power the pitch lighting. General building works to channel the lines between the GENERATORS and the GENERAL PANELS. Installation of the connection lines between the GROUPS: ET1 = 250 KVA, ET2 = 200 KVA, ET3 = 500 KVA, ETT = 325 KVA